Now hiring! Stop by or see the "Employment" tab for a link to our applications!


image1

NOTABLE PROJECTS

Owensboro Medical Health System New Hospital - Owensboro, Kentucky 

General Contractor: Turner Universal Construction,  Owensboro, Ky  Site Project size: 154 acres,  $12 million  Scope of Work,  Clearing, Mass Excavation, grading, Erosion Control, Soil Stabilization, Storm Sewer, Sanitary Sewer, stone subbase,  Asphalt Paving, concrete curbs POC:  Merrill Bowers  e-mail   mbowers@tcco.com Complete Spring 2013  


Fort Knox Human Resources Command - Fort Knox, Kentucky 

General Contractor: Turner Universal Construction Huntsville, Alabama  Site Project size:100 acres, $10 million in site development. Largest GC Project in history of Fort Knox . Project set the standard at Fort Knox for Milcon projects at the base finishing ahead of schedule. Scope of Work: Member of  Successful Design Build Team, we provided design assist, Clearing, Earthwork, Pavements, Erosion Control, Storm Sewer, Sanitary, Gas, Domestic and Fire Water,  Concrete curbs, segmented retaining walls ,UXO unexploded ordnance. Completed 2010 P.O.C.: Brian Herrin (256) 461-6781   


Kentucky Highway 313 phase 2 Extension - Meade County, Kentucky 

Owner: Kentucky Transportation Cabinet  Frankfort Ky Project Size:  Turnkey 3.6 miles of new limited access Highway value $6,014,000.00 Scope of work: including mass excavation, demolition, storm, soil stabilization, Rock Excavation, Stone Subbase, Box Culvert and paving, guardrail, erosion control, seeding POC: Paul Sanders,  District Engineer  (270) 766-5066 completed 2012  


Kentucky Highway 313 phase 5 Extension - Meade County, Kentucky 

Owner: Kentucky Transportation Cabinet  Frankfort Ky Project Size:  Turnkey 2.2 miles of new limited access Highway value $6,600,000.00 Scope of work: mass excavation, demolition, storm, soil stabilization, Stone Subbase,paving, guardrail, electrical signalization, erosion control, seeding POC: Paul Sanders,  District Engineer  (270) 766-5066 completed 2017




image2




CURRENT PROJECTS

Highway 313 Road Widening - Hardin County, Kentucky $12.4 million

Summit Creek Subdivision - Elizabethtown, Kentucky $4.2 million 

Jim Beam Liquid Recovery Facility - Boston, Kentucky

Metalsa Manufaturing E-coat Expansion - Elizabethtown, Kentucky $1.5 million 

VA Community Outpatient Clinic - Ft Knox, Kentucky $1 million

Morvins Landing and Boat Ramp - Harrison County, Indiana  $1.1 million 

Pear Orchard Road Improvements -  Elizabethtown, Kentucky $1 million

image3

COMPLETED PROJECTS

  


Harsh Ditch Phase IIA - Owensboro, Kentucky 

Owner: City of Owensboro, Ky Project Size:  Reroute, improve  stormwater through Owensboro, Ky using Pipe, Large Box Culverts, Paved waterways , and detention basins through urban areas involving rerouting utilities, roadway detours and reconstruction value $4.6 million POC: Paul Sanders,  District Engineer  (270) 766-5066, completed 2017  


Scherm Ditch Drainage Phase IV - Owensboro, Kentucky 

Owner: City of Owensboro, Ky Project Size:  Reroute, improve  stormwater through Owensboro, Ky using Pipe, Large Box Culverts, Paved waterways , and detention basins through urban areas involving rerouting utilities, roadway detours and reconstruction value $3.77 million  


Ft Knox Contingency Operations Location - Fort Knox, Kentucky

Owner: Department of Defense , Fort Knox, Ky Project Size: $1.2 million Scope of work: mass excavation, stone paving,  water utilities, concrete bases for military mobile structures, guardrails, gates. POC: Scott Matheny, Semper Tek Prime Contractor  (859) 252-8339, completed 2018 2nd qtr  


Heaven Hill Barrel Unloading Facility - Bardstown, Kentucky 

Owner: Heaven Hill Distilleries,  GC Abel Construction Project Size: $1.1 million Scope of work: design assist, mass excavation, demolition, storm, Stone subbase, Foundation Excavation, erosion control POC: Derrick Anderson, (502) 451-2235 Abel Construction, completed 2017  


19th Engineer Battalion Complex - Fort Knox, Kentucky 

General Contractor: BL Harbert International Birmingham, Alabama  Site Project size: $2.6 million  Scope of Work, Demolition, Mass Excavation, grading, Erosion Control,  Storm Sewer, Concrete Hardscape,  Underground Utilities, stone subbase,  Asphalt Paving. POC: Ricky Aldape   (205) 802-2800  


MOUT Zussman Range Urban Combat Training Center - Fort Knox, Kentucky 

General Contractor: ACC McKnight,  Augusta, Georgia  Site Project size: $1 million Scope of Work,  Clearing, Mass Excavation, grading, Erosion Control,  Storm Sewer, Absorption Trenches, stone subbase,  Asphalt Paving, concrete curbs for special effects combat training facility including airport runway, simulated villages. POC:  Jack Kelley  (706) 564-4301, completed Spring 2013  


Fort Knox IBCT Barracks - Fort Knox, Kentucky 

General Contractor: Alutiiq Construction, Kodiak Alaska /Messer Construction, Louisville, Ky Project size: $2,500,000.00    Final Summer 2008 Scope of Work: Earthwork, Pavement, Erosion Control, Storm Sewer, Asphalt, Concrete Curbs, Domestic Water, Sanitary Sewer P.O.C.: Steve Stragand (502) 261-9775  


Metalsa Site - Elizabethtown, Kentucky 

General Contractor: Scott and Murphy. Bowling Green Ky Project Size: $1,032,548.00   Scope: ,Mass Excavation, grading, Erosion Control,  Storm Sewer,  Underground Utilities,Stone Paving.  POC: Frankie Sewell Scott and Murphy (270) 781-9944   


Fort Knox High School Demolition/Restoration - Fort Knox, Kentucky

General Contractor: Barton Malow Company, Columbus, OH  Project Size: $1.3 million  Completed Fall 2009 Scope of Work: School and Site demolition, Clearing, Earthwork, Erosion Control, Storm Sewer, Sanitary Sewer, Water, Site Concrete and Curbs, Pavements P.O.C.: Tom Schulz (248) 436-5240   


Rose Creek Sanitary Sewer Project- Vine Grove, Kentucky 

Architect/Engineer: HDR Louisville Ky Project Size: $1,408,000.00 Scope of Work: Sanitary Sewer P.O.C.: City of Vine Grove (270-877-2422)  Louisville Gas and Electric Compressor Stations  General Contractor : MEC Construction, West Virginia Scope of Work,  Demolition, Mass Excavation, grading, Erosion Control,  Storm Sewer, Pipeline  Onsite Sewage Systems, Paving,  completion April  2013  


Fort Knox IET Barracks and Battalion Dining Facility - Fort Knox, Kentucky 

General Contractor: Messer Construction, Louisville, Ky Project size: $3,000,000.00 (Barracks portion of Project was terminated prematurely due to US base realignment) Scope of Work: Earthwork, Pavement, Erosion Control, Storm Sewer, Asphalt, Concrete curbs, Domestic Water, Sanitary Sewer) P.O.C.: John Megibben (502) 261-9775  


New Salem Church Road Water Extension - Hardin County, Kentucky 

Engineer: Quest Engineers. Prime Contract Project size: $2,300,000.00 Scope of work: 20 miles of waterline and a booster pump station P.O.C.: Kevin Bryan, PE, Quest Engineers (502-584-4118)  Don’s Lumber Railroad R spur, Distribution Center Engineer: Dunaway/Phillips Design Build, Scope of Work: Clearing, Grade and Drain, stone and asphalt paving P.O.C.: Troy Basham, owner (270) 877-2121  


Freeman Lake Reservoir Dam -  Elizabethtown, Kentucky 

Engineer: Fuller, Mossberger, Scott, May Scope: Construct Approx. 250,000 CY of Embankment P.O.C. Charlie Denham Bluegrass Contracting Corp. (800) 433-2268  


Kentucky Industrial Wastehaulers Site Reclamation - Elizabethtown, Kentucky 

Engineer:  Shield Environmental, Lexington, KY Project Size:  $1,400,000.00   Scope of Work:  Relocation of underground storm collection, sanitary and water systems as well  as stripping cover, relocating hazardous waste and covering site with clay cap & geo membrane. P.O.C.:  Duane Guilfoil (859) 294-5155