NOTABLE PROJECTS

Owensboro Medical Health System New Hospital - Owensboro, Kentucky 

General Contractor: Turner Universal Construction- Owensboro, Kentucky  

Project Size: 154 acres  

Contract Amount: $12 million  

Scope of Work:  clearing, mass excavation, grading, erosion control, soil stabilization, storm sewer, sanitary sewer, stone subbase, asphalt paving, and concrete curbs. 

POC:  Merrill Bowers,  E-mail:   mbowers@tcco.com 

Completed Spring 2013  


Fort Knox Human Resources Command - Fort Knox, Kentucky 

General Contractor: Turner Universal Construction- Huntsville, Alabama  

Project Size: 100 acres

Contract Amount: $10 million in site development. Largest GC project in history of Fort Knox. Project set the standard at Fort Knox for Milcon projects at the base finishing ahead of schedule. 

Scope of Work: clearing, earthwork, pavements, erosion control, storm sewer, sanitary sewer, gas, domestic and fire water, concrete curbs, segmented retaining walls, and unexploded ordnance (UXO). 

POC: Brian Herrin- (256) 461-6781   

Completed 2010 


Kentucky Highway 313 Phase 2 Extension - Meade County, Kentucky 

Owner: Kentucky Transportation Cabinet- Frankfort, Kentucky 

Project Size:  Turnkey 3.6 miles of new limited access highway

Contract Amount: $6,014,000.00. 

Scope of Work: mass excavation, demolition, storm sewer, soil stabilization, rock excavation, stone subbase, box culvert and paving, guardrail, erosion control, and seeding.

POC: Paul Sanders, District Engineer: (270) 766-5066 

Completed 2012  


Kentucky Highway 313 Phase 5 Extension - Meade County, Kentucky 

Owner: Kentucky Transportation Cabinet- Frankfort, Kentucky

Project Size:  Turnkey 2.2 miles of new limited access highway

Contract Amount: $6.6 Million

Scope of Work: mass excavation, demolition, storm sewer, soil stabilization, stone subbase, paving, guardrail, electrical signalization, erosion control, and seeding.

POC: Paul Sanders, District Engineer: (270) 766-5066

Completed 2017

 

Fort Knox DAGIR Range- Fort Knox, Kentucky

General Contractor: Howard W. Pence Inc.- Elizabethtown, Kentucky 

Project Size: 2500 acres

Contract Amount: $28 million

Scope of Work: site development, target upgrades and electric/communication. New construction along with refurbishing existing site. 


Kentucky Highway 313 Phase 6 Extension - Hardin County, Kentucky

Owner: Kentucky Transportation Cabinet- Frankfort, Kentucky 

Project Size: Turnkey 3.8 miles of new limited access highway

Contract Amount: $13 Million

Scope of Work: construct two new lanes for traffic, demolition, storm sewer, soil stabilization, stone subbase, paving, guardrail and seeding.  

POC: Paul Sanders, District Engineer: (270) 766-5066 


Fort Knox Community Based Outpatient Clinic (CBOC)- Fort Knox, Kentucky 

General Contractor: Semper Tek, Inc.- Lexington, Kentucky

Project Size 6.7 acres

Contract Amount: $1.2 Million

Scope of Work: site development, storm drainage, and underground utilities. 

Completed 2020  

ACTIVE PROJECTS

COMPLETED PROJECTS

Highway 313 Road Widening - Hardin County, Kentucky 

Project Size: $12.4 million

Scope of Work: 4.7 miles of new road construction, mass excavation, storm drainage, water main relocation, sanitary sewer reconstruction, road detours, lime stabilization, stone subbase, and asphalt paving.


Morvins Landing and Boat Ramp - Harrison County, Indiana  

Owner: State of Indiana Parks and Recreation

Project Size: $1.1 million 

Scope of Work: mass import of dirt, road construction, stone subbase, asphalt, storm drainage, concrete boat ramp and parking lot.


Pear Orchard Road Improvements -  Elizabethtown, Kentucky 

Owner: State of Kentucky

Project Size: $1 million

Scope of Work: road construction, asphalt paving, concrete sidewalk, curb/gutter, and road detours. Turning lanes were constructed for safe access onto Ring Road.


Harsh Ditch Phase IIA - Owensboro, Kentucky 

Owner: City of Owensboro, KY 

Project Size: $4.6 million 

Scope of Work: Reroute and improve storm water drainage system through Owensboro, KY, using pipe, large box culverts, paved waterways, and detention basins through urban areas involving rerouting utilities, roadway detours, and reconstruction. 

POC: Paul Sanders, District Engineer: (270) 766-5066

Completed 2017  


Scherm Ditch Drainage Phase IV - Owensboro, Kentucky 

Owner: City of Owensboro, KY 

Project Size:  $3.77 million

Scope of Work: Reroute and improve storm water drainage system through Owensboro, KY, using pipe, large box culverts, paved waterways, and detention basins through urban areas involving rerouting utilities, roadway detours, and reconstruction.   


Metalsa Manufacturing E-Coat Expansion - Elizabethtown, Kentucky 

Project Size: $1.5 million 

Scope of Work: demo existing concrete, install storm drainage system, install water main installation, railroad demolition, and gas main installation. 


Fort Knox Contingency Operations Location - Fort Knox, Kentucky

Owner: Department of Defense- Fort Knox, KY

Project Size: $1.2 million 

Scope of Work: mass excavation, stone paving, water utilities, concrete bases for military mobile structures, guardrails, and gates. 

POC: Scott Matheny, Semper Tek Prime Contractor:  (859) 252-8339

Completed 2018  


Heaven Hill Barrel Unloading Facility - Bardstown, Kentucky 

Owner: Heaven Hill Distilleries; General Contractor: Abel Construction 

Project Size: $1.1 million 

Scope of Work: design assist, mass excavation, demolition, storm, stone subbase, foundation excavation, and erosion control.

POC: Derrick Anderson, Abel Construction: (502) 451-2235 

Completed 2017  


19th Engineer Battalion Complex - Fort Knox, Kentucky 

General Contractor: BL Harbert International- Birmingham, Alabama  

Project Size: $2.6 million  

Scope of Work: demolition, mass excavation, grading, erosion control, storm sewer, concrete hardscape,  underground utilities, stone subbase, and asphalt paving. 

POC: Ricky Aldape-  (205) 802-2800  


MOUT Zussman Range Urban Combat Training Center - Fort Knox, Kentucky 

General Contractor: ACC McKnight- Augusta, Georgia  

Project Size: $1 million 

Scope of Work: clearing, mass excavation, grading, erosion control,  storm sewer, absorption trenches, stone subbase, asphalt paving, and concrete curbs for special effects combat training facility including airport runway and simulated villages. 

POC:  Jack Kelley- (706) 564-4301

Completed Spring 2013  


Fort Knox IBCT Barracks - Fort Knox, Kentucky 

General Contractor: Alutiiq Construction- Kodiak, Alaska /

             Messer Construction- Louisville, KY

Project Size: $2.5 Million

Scope of Work: earthwork, pavement, erosion control, storm sewer, asphalt, concrete curbs, domestic water, and sanitary sewer.

POC: Steve Stragand- (502) 261-9775  

Completed Summer of 2008


Metalsa Site - Elizabethtown, Kentucky 

General Contractor: Scott and Murphy- Bowling Green, KY

Project Size: $1,032,548.00   

Scope of Work: mass excavation, grading, erosion control, storm sewer, underground utilities, and stone paving.  

POC: Frankie Sewell, Scott and Murphy: (270) 781-9944   


Fort Knox High School Demolition/Restoration - Fort Knox, Kentucky

General Contractor: Barton Malow Company- Columbus, OH  

Project Size: $1.3 million   

Scope of Work: school and site demolition, clearing, earthwork, erosion control, storm sewer, sanitary sewer, water, site concrete and curbs, and pavements.

POC: Tom Schulz- (248) 436-5240  

Completed Fall of 2009 


Rose Creek Sanitary Sewer Project- Vine Grove, Kentucky 

Architect/Engineer: HDR- Louisville, KY

Project Size: $1,408,000.00 

Scope of Work: sanitary sewer. 

POC: City of Vine Grove- (270) 877-2422


Fort Knox IET Barracks and Battalion Dining Facility - Fort Knox, Kentucky 

General Contractor: Messer Construction- Louisville, KY 

Project size: $3 Million (Barracks portion of project was terminated prematurely due to U.S. base realignment.) 

Scope of Work: earthwork, pavement, erosion control, storm sewer, asphalt, concrete curbs, domestic water, and sanitary sewer.

POC: John Megibben- (502) 261-9775  


New Salem Church Road Water Extension - Hardin County, Kentucky 

Engineer: Quest Engineers

Project size: $2.3 Million

Scope of Work: 20 miles of waterline and a booster pump station.

POC: Kevin Bryan, PE, Quest Engineers: (502) 584-4118  


Don’s Lumber Railroad R Spur, Distribution Center 

Engineer: Dunaway/Phillips Design Build 

Scope of Work: clearing, grade and drain, as well as stone and asphalt paving.

POC: Troy Basham, Owner: (270) 877-2121  


Freeman Lake Reservoir Dam -  Elizabethtown, Kentucky 

Engineer: Fuller, Mossberger, Scott, May 

Scope of Work: construct approx. 250,000 CY of embankment. 

POC: Charlie Denham, Bluegrass Contracting Corp.: (800) 433-2268  


Kentucky Industrial Wastehaulers Site Reclamation - Elizabethtown, Kentucky 

Engineer:  Shield Environmental- Lexington, KY 

Project Size:  $1.4 Million  

Scope of Work:  relocation of underground storm collection, sanitary and water systems, as well as stripping cover. Relocating hazardous waste and covering site with clay cap & geo membrane. 

POC:  Duane Guilfoil- (859) 294-5155