Owensboro Medical Health System New Hospital - Owensboro, Kentucky
General Contractor: Turner Universal Construction- Owensboro, Kentucky
Project Size: 154 acres
Contract Amount: $12 million
Scope of Work: clearing, mass excavation, grading, erosion control, soil stabilization, storm sewer, sanitary sewer, stone subbase, asphalt paving, and concrete curbs.
POC: Merrill Bowers, E-mail: mbowers@tcco.com
Completed Spring 2013
Fort Knox Human Resources Command - Fort Knox, Kentucky
General Contractor: Turner Universal Construction- Huntsville, Alabama
Project Size: 100 acres
Contract Amount: $10 million in site development. Largest GC project in history of Fort Knox. Project set the standard at Fort Knox for Milcon projects at the base finishing ahead of schedule.
Scope of Work: clearing, earthwork, pavements, erosion control, storm sewer, sanitary sewer, gas, domestic and fire water, concrete curbs, segmented retaining walls, and unexploded ordnance (UXO).
POC: Brian Herrin- (256) 461-6781
Completed 2010
Kentucky Highway 313 Phase 2 Extension - Meade County, Kentucky
Owner: Kentucky Transportation Cabinet- Frankfort, Kentucky
Project Size: Turnkey 3.6 miles of new limited access highway
Contract Amount: $6,014,000.00.
Scope of Work: mass excavation, demolition, storm sewer, soil stabilization, rock excavation, stone subbase, box culvert and paving, guardrail, erosion control, and seeding.
POC: Paul Sanders, District Engineer: (270) 766-5066
Completed 2012
Kentucky Highway 313 Phase 5 Extension - Meade County, Kentucky
Owner: Kentucky Transportation Cabinet- Frankfort, Kentucky
Project Size: Turnkey 2.2 miles of new limited access highway
Contract Amount: $6.6 Million
Scope of Work: mass excavation, demolition, storm sewer, soil stabilization, stone subbase, paving, guardrail, electrical signalization, erosion control, and seeding.
POC: Paul Sanders, District Engineer: (270) 766-5066
Completed 2017
Fort Knox DAGIR Range- Fort Knox, Kentucky
General Contractor: Howard W. Pence Inc.- Elizabethtown, Kentucky
Project Size: 2500 acres
Contract Amount: $28 million
Scope of Work: site development, target upgrades and electric/communication. New construction along with refurbishing existing site.
Kentucky Highway 313 Phase 6 Extension - Hardin County, Kentucky
Owner: Kentucky Transportation Cabinet- Frankfort, Kentucky
Project Size: Turnkey 3.8 miles of new limited access highway
Contract Amount: $13 Million
Scope of Work: construct two new lanes for traffic, demolition, storm sewer, soil stabilization, stone subbase, paving, guardrail and seeding.
POC: Paul Sanders, District Engineer: (270) 766-5066
Fort Knox Community Based Outpatient Clinic (CBOC)- Fort Knox, Kentucky
General Contractor: Semper Tek, Inc.- Lexington, Kentucky
Project Size 6.7 acres
Contract Amount: $1.2 Million
Scope of Work: site development, storm drainage, and underground utilities.
Completed 2020
Highway 313 Road Widening - Hardin County, Kentucky
Project Size: $12.4 million
Scope of Work: 4.7 miles of new road construction, mass excavation, storm drainage, water main relocation, sanitary sewer reconstruction, road detours, lime stabilization, stone subbase, and asphalt paving.
Morvins Landing and Boat Ramp - Harrison County, Indiana
Owner: State of Indiana Parks and Recreation
Project Size: $1.1 million
Scope of Work: mass import of dirt, road construction, stone subbase, asphalt, storm drainage, concrete boat ramp and parking lot.
Pear Orchard Road Improvements - Elizabethtown, Kentucky
Owner: State of Kentucky
Project Size: $1 million
Scope of Work: road construction, asphalt paving, concrete sidewalk, curb/gutter, and road detours. Turning lanes were constructed for safe access onto Ring Road.
Harsh Ditch Phase IIA - Owensboro, Kentucky
Owner: City of Owensboro, KY
Project Size: $4.6 million
Scope of Work: Reroute and improve storm water drainage system through Owensboro, KY, using pipe, large box culverts, paved waterways, and detention basins through urban areas involving rerouting utilities, roadway detours, and reconstruction.
POC: Paul Sanders, District Engineer: (270) 766-5066
Completed 2017
Scherm Ditch Drainage Phase IV - Owensboro, Kentucky
Owner: City of Owensboro, KY
Project Size: $3.77 million
Scope of Work: Reroute and improve storm water drainage system through Owensboro, KY, using pipe, large box culverts, paved waterways, and detention basins through urban areas involving rerouting utilities, roadway detours, and reconstruction.
Metalsa Manufacturing E-Coat Expansion - Elizabethtown, Kentucky
Project Size: $1.5 million
Scope of Work: demo existing concrete, install storm drainage system, install water main installation, railroad demolition, and gas main installation.
Fort Knox Contingency Operations Location - Fort Knox, Kentucky
Owner: Department of Defense- Fort Knox, KY
Project Size: $1.2 million
Scope of Work: mass excavation, stone paving, water utilities, concrete bases for military mobile structures, guardrails, and gates.
POC: Scott Matheny, Semper Tek Prime Contractor: (859) 252-8339
Completed 2018
Heaven Hill Barrel Unloading Facility - Bardstown, Kentucky
Owner: Heaven Hill Distilleries; General Contractor: Abel Construction
Project Size: $1.1 million
Scope of Work: design assist, mass excavation, demolition, storm, stone subbase, foundation excavation, and erosion control.
POC: Derrick Anderson, Abel Construction: (502) 451-2235
Completed 2017
19th Engineer Battalion Complex - Fort Knox, Kentucky
General Contractor: BL Harbert International- Birmingham, Alabama
Project Size: $2.6 million
Scope of Work: demolition, mass excavation, grading, erosion control, storm sewer, concrete hardscape, underground utilities, stone subbase, and asphalt paving.
POC: Ricky Aldape- (205) 802-2800
MOUT Zussman Range Urban Combat Training Center - Fort Knox, Kentucky
General Contractor: ACC McKnight- Augusta, Georgia
Project Size: $1 million
Scope of Work: clearing, mass excavation, grading, erosion control, storm sewer, absorption trenches, stone subbase, asphalt paving, and concrete curbs for special effects combat training facility including airport runway and simulated villages.
POC: Jack Kelley- (706) 564-4301
Completed Spring 2013
Fort Knox IBCT Barracks - Fort Knox, Kentucky
General Contractor: Alutiiq Construction- Kodiak, Alaska /
Messer Construction- Louisville, KY
Project Size: $2.5 Million
Scope of Work: earthwork, pavement, erosion control, storm sewer, asphalt, concrete curbs, domestic water, and sanitary sewer.
POC: Steve Stragand- (502) 261-9775
Completed Summer of 2008
Metalsa Site - Elizabethtown, Kentucky
General Contractor: Scott and Murphy- Bowling Green, KY
Project Size: $1,032,548.00
Scope of Work: mass excavation, grading, erosion control, storm sewer, underground utilities, and stone paving.
POC: Frankie Sewell, Scott and Murphy: (270) 781-9944
Fort Knox High School Demolition/Restoration - Fort Knox, Kentucky
General Contractor: Barton Malow Company- Columbus, OH
Project Size: $1.3 million
Scope of Work: school and site demolition, clearing, earthwork, erosion control, storm sewer, sanitary sewer, water, site concrete and curbs, and pavements.
POC: Tom Schulz- (248) 436-5240
Completed Fall of 2009
Rose Creek Sanitary Sewer Project- Vine Grove, Kentucky
Architect/Engineer: HDR- Louisville, KY
Project Size: $1,408,000.00
Scope of Work: sanitary sewer.
POC: City of Vine Grove- (270) 877-2422
Fort Knox IET Barracks and Battalion Dining Facility - Fort Knox, Kentucky
General Contractor: Messer Construction- Louisville, KY
Project size: $3 Million (Barracks portion of project was terminated prematurely due to U.S. base realignment.)
Scope of Work: earthwork, pavement, erosion control, storm sewer, asphalt, concrete curbs, domestic water, and sanitary sewer.
POC: John Megibben- (502) 261-9775
New Salem Church Road Water Extension - Hardin County, Kentucky
Engineer: Quest Engineers
Project size: $2.3 Million
Scope of Work: 20 miles of waterline and a booster pump station.
POC: Kevin Bryan, PE, Quest Engineers: (502) 584-4118
Don’s Lumber Railroad R Spur, Distribution Center
Engineer: Dunaway/Phillips Design Build
Scope of Work: clearing, grade and drain, as well as stone and asphalt paving.
POC: Troy Basham, Owner: (270) 877-2121
Freeman Lake Reservoir Dam - Elizabethtown, Kentucky
Engineer: Fuller, Mossberger, Scott, May
Scope of Work: construct approx. 250,000 CY of embankment.
POC: Charlie Denham, Bluegrass Contracting Corp.: (800) 433-2268
Kentucky Industrial Wastehaulers Site Reclamation - Elizabethtown, Kentucky
Engineer: Shield Environmental- Lexington, KY
Project Size: $1.4 Million
Scope of Work: relocation of underground storm collection, sanitary and water systems, as well as stripping cover. Relocating hazardous waste and covering site with clay cap & geo membrane.
POC: Duane Guilfoil- (859) 294-5155